Sign In | Join Free | My himfr.com
Home > Superheater And Reheater >

Boiler Primary Superheater Reheater Economiser In Steam Power Plant

Zhangjiagang HuaDong Boiler Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Boiler Primary Superheater Reheater Economiser In Steam Power Plant from wholesalers
     
    Buy cheap Boiler Primary Superheater Reheater Economiser In Steam Power Plant from wholesalers
    • Buy cheap Boiler Primary Superheater Reheater Economiser In Steam Power Plant from wholesalers
    • Buy cheap Boiler Primary Superheater Reheater Economiser In Steam Power Plant from wholesalers
    • Buy cheap Boiler Primary Superheater Reheater Economiser In Steam Power Plant from wholesalers
    • Buy cheap Boiler Primary Superheater Reheater Economiser In Steam Power Plant from wholesalers

    Boiler Primary Superheater Reheater Economiser In Steam Power Plant

    Ask Lasest Price
    Brand Name : HD Boiler
    Model Number : Superheater
    Certification : ASME, ISO9001, EN
    Price : 2,000 - 5,000 USD per pc
    Payment Terms : T/T, L/C at sight
    Supply Ability : About 1,000 tons per month
    Delivery Time : Within 90 Days after getting the down payment or L/C
    • Product Details
    • Company Profile

    Boiler Primary Superheater Reheater Economiser In Steam Power Plant

    Biomass Waste Heat Rediated Boiler Steam Superheater Serpentuator Stainless Steel​


    How to maintain superheaters and reheaters?


    Regular cleaning, temperature monitoring, and using high-quality feedwater help prevent damage.


    Differences


    TypeAdvantagesDisadvantagesSupporting method
    Pendant-type1.Firm structural support1. Flow blockage by condensed steam 2. Needs a slow restart to purge the water that accumulates in the bottom.supported from above
    Inverted-type1.Proper drainage of the condensed steam1. Lack the structural rigidity, especially in high speed gas flowSupported from below
    Horizontal -type

    1. Proper drainage

    2. Good structural rigidity.

    1. They do not view the flam directly so they are mainly from the convective typeUsually supported in the vertical gas ducts parallel to the main furnace.

    Boiler Primary Superheater Reheater Economiser In Steam Power Plant


    Principle


    • Principle of superheater is similar to steam generating tubes of boiler.

    The hot gases at high temperature sweep over superheater tubes and raise the temperature of steam which magnitude depends upon exit gas temperature leaving the superheater and gas velocity.


    Application


    Use for heating saturated steam, steam temperature could be up to 900 degree C.

    Superheater Capacity Upgrades to Increase Power Generation


    Send us required technical data, such as steam capacity, presure, required temperature etc. We will design accordingly.


    Quality Boiler Primary Superheater Reheater Economiser In Steam Power Plant for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhangjiagang HuaDong Boiler Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)